January 02, 2007
That's Just Mean
I described in O.K. That Hurts and That's Gonna Leave A Mark how a simple cosmetic upgrade to a bathroom turned into gutting the room down to the framing and starting over. By the time we got to the damaged plaster walls behind the tile, I wasn't shocked or surprised. I had made peace with the expenditure. Yesterday the refrigerator died.
Several hundred dollars worth of food gone. This is the second time in four years this piece of crap from GE has done this. It will not be repaired - it will be replaced. With a different brand.
Posted by: Stephen Macklin at 03:48 AM | Comments (1) | Add Comment
21kb generated in 0.0353 seconds; 40 queries returned 178 records.
Powered by Minx 1.1.4-pink.
Powered by Minx 1.1.4-pink.









